Back
en-GB
£
Your Remap
Choose Method
Choose a Date & Time
Your Details
Choose Extras
Payment
SEAT
Make:
SEAT

Range:
Leon (MK3) 2012 >

Fuel:
Petrol

Model:
FR 1.4 (138 bhp)

SEAT Leon (MK3) 2012 > FR 1.4 (138 bhp) Petrol

Remapping your SEAT with one of our custom ECU remaps can improve both torque and BHP, resulting in improved power, response and performance. Each map we install is tailored specifically for your SEAT and has been dyno tested and developed to maximize gains and minimize the risk of component failure.

Tuning your SEAT ECU will unleash your engines maximum potential.

This stage 1 software for your SEAT is designed for use with standard components and is within the tolerances of your vehicle. This is classed as a fast road application which is the best all round performance for SEAT ’s.

Manufacturers

Base BHP & Torque

BHP
5.78 BHP
Torque
5.78 Nm

POWER BHP

Actual Tested

Original
5.78 BHP
Modified
5.78 BHP
Difference
+5.78 BHP

TORQUE NM

Actual Tested

Original
5.78 Nm
Modified
5.78 Nm
Difference
+5.78 Nm


Remapping your SEAT with one of our custom ECU remaps can improve both torque and BHP, resulting in improved power, response and performance. Each map we install is tailored specifically for your SEAT and has been dyno tested and developed to maximize gains and minimize the risk of component failure.

Tuning your SEAT ECU will unleash your engines maximum potential.

This stage 1 software for your SEAT is designed for use with standard components and is within the tolerances of your vehicle. This is classed as a fast road application which is the best all round performance for SEAT ’s.


See what our customers are saying about us.


OR SEARCH AGAIN

This website is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.


Please wait...


Searching for your remap

Spinning Search Wheel
Searching for your remap

Tractor Wheel

PLEASE WAIT
WE'RE SEARCHING FOR YOUR BEST MATCH

Processing
Payment Process

*Offer Terms & Conditions

* Offer ends 30th of November 2026 and bookings must be made before 30th of December 2026. Money is off full priced remaps only. No cash alternative is available. UK remaps Only.

Please click for full Terms of Sale

CALL 01280 816781 TODAY TO BOOK YOUR REMAP

We remap: